Structural work and groundworks
Groundworks and groundworkers
Groundworks are the digging, drainage and concrete work that happens at the start of a building project. They are priced after a look at the job, because the ground, the access and the size of the work all change the cost. Most extensions, outbuildings and new walls start with groundworks.
Post your building job to Premium membersTell us about your job once. Premium builders who cover your area can then contact you.Describe your job
What this covers
Typical price. Priced after a look at the job.
What the job covers
- Digging and pouring foundations
- Laying drainage runs and connecting to the sewer
- Clearing and levelling the site
- Preparing bases for sheds, garages and extensions
- Laying hardcore, concrete slabs and paths
Worth knowing
England and Wales
In England and Wales, GOV.UK says you must tell your neighbours if you plan building work near or on your shared property boundary, or party wall. This includes work on an existing party wall or party structure, and digging below and near their property's foundation level. GOV.UK says to give notice between 2 months and 1 year before you plan to start. It says party wall agreements are separate from planning permission and building regulations approval.
Party walls and building work, gov.uk
What is involved
Groundworks prepare the ground for the building that goes on top. They include clearing the site, digging out to the right level, laying drains and digging and pouring foundations. They also cover concrete bases for garages, sheds and garden rooms, and hardcore and concrete for drives, paths and patios.
The work starts with setting out the lines of the new building and clearing the site. Machines are often used to dig trenches and move earth, and the spoil is taken away in skips or lorries. Foundations are dug to the depth the design calls for and filled with concrete once the ground has been looked at.
Drainage is often done at the same stage. That can mean laying pipes for rainwater and waste, building inspection chambers and connecting to the existing drains. Hardcore and concrete are then laid to make the base, ready for the brickwork or frame above.
Foundations and drainage are covered by building regulations, and building control usually inspects them at set stages. Work near a neighbour's boundary or foundations may need a party wall notice, and GOV.UK says you must tell your neighbour if you dig below and near the level of their foundations. Ask your builder who arranges these.
Choosing someone for the job
Ask for a written quote that says what is included, such as digging, removing spoil, concrete, drainage and connecting to the sewer. Ask about the ground, and what happens if the digging finds something unexpected, such as soft soil, tree roots or old drains. Ask whether the price includes VAT, and who arranges building control inspections and any party wall notice. Ask to see proof of public liability insurance.
Worth reading first:
Related jobs:
Common questions
What are groundworks?
Groundworks are the first stage of a building project. They include site clearance, digging, foundations, drainage and concrete bases, and they get the ground ready for the walls and roof.
What jobs need groundworks?
Extensions, garages, outbuildings, garden rooms, new walls, drives and patios all involve some groundworks.
Why are groundworks priced after a look at the job?
The cost depends on things a drawing does not show, such as the soil, how easy it is to get a machine in, and where the drains run. A builder who has looked at the site can give a fairer price.
Does groundwork need building regulations approval?
Foundations and drainage for most building work are covered by building regulations, so your builder arranges inspections at set stages. See our building regulations guide.